DashboardPrivate product environment
System online
WellOS operational command centre

Job lifecycle

Design, execute, report, approve and distribute every job from one controlled workspace.

Private owner workspace
QUALITY HISTORYEVIDENCE LINKED

Carry lessons learned into the next job

Review previous operational findings, incidents, corrective actions, equipment history and approved well evidence. If history is not available, WellOS must say so and cannot infer it.

Decision basisVerified records onlyMissing historyShown as unavailable
SLICKLINE JOB DESIGNPRE-WORK RELEASE GATE

Approve the job before execution

Keep the controlled programme, well revision, toolstring/tool-change diagram, pressure-control equipment diagram and complete pre-job approval pack together.

Release scopeSlickline firstExecution gateLOCKED
Interactive pre-job team
Ask, source, check, then write
12 EVIDENCE GAPS

The Well Services Agent builds the operational basis, the HSE / MS Agent checks governing sources, and the QA / QC Agent finds missing or conflicting evidence. No agent may invent a pressure, depth, barrier, rating, serial, procedure or legal requirement.

WSOPEN

Well Services Agent

Collects job scope, current completion, installed tools, verified pressures and cited well history.

HSOPEN

HSE / MS Agent

Checks accessible client procedures, contractor/client HSE systems and current controlling requirements.

QCOPEN

QA / QC Agent

Checks completeness, source traceability, conflicts and unresolved hold points before programme approval.

Well Services Agent · Job Design
Talk through the job and hear the agent reply
CHECKING MODEL
Current evidence gap · Job name and job type
AI-generated voice · change while disconnected
Two-way conversationStart voice, say hello and the agent will answer aloud.
Conversation is retained on this device. Nothing enters the controlled programme until the supervisor explicitly stages and records it against the current evidence field.
PR-100 source unavailable

PR-100-PRO-0229-1 is registered by filename only. Its content and controlled revision have not been ingested, so WellOS will not quote or apply it.

DO NOT USE
Well Services Agent

What is the controlled job name and exact slickline job type?

Review all critical job facts
Every open item remains a release blocker. The programme draft is not engineering approval.
Program Builder

Controlled slickline programme

Start from the approved scope and current well record. WellOS may help organise verified information, but it cannot invent a barrier, depth, pressure, test criterion or procedure.

Pre-job document approvalEXECUTION LOCKED

Job Execution stays locked until every controlled pre-job document is approved against the saved programme revision.

No execution release has been recorded on this device. A shared immutable audit trail is required before client field rollout.
JOB DESIGNPCU BUILDER

Build the pressure-control package

Record the approved PCU configuration, equipment identity, certification status and pressure-test basis with the programme.

ConfigurationNot selectedRelease gateCertification + test basis
PCU Builder

Pressure-control equipment package

Build only from controlled equipment records. Test pressures, hold times, acceptance criteria and ratings must come from the approved programme and current certification.

PRE-JOB GATE

Job Execution is locked

The approved programme, toolstring/tool-change diagram, PCE diagram and complete pre-job approval pack must receive a recorded green light first.

POST JOBPROGRAMME-GROUNDED QA

Review, approve and issue

Compare the completed report with the approved wellsite programme, close every highlighted item, then pass the controlled issue through contractor and client approval.

AI ruleNever guessDistribution gateClient approval required
Final Report · Programme QA

Highlight what needs human review

Load the exact approved Job Design programme and the completed report. WellOS flags potential omissions, abnormalities, sequence conflicts and unsupported statements. It calls a value abnormal only when the programme supplies the limit or acceptance criterion.

NO APPROVED REVISION LINKED
AWAITING BOTH CONTROLLED RECORDS
The review queue opens after both the approved programme and completed report are supplied.
Crystal Gauge Data Graph Builder

Build the controlled pressure and temperature evidence

Load the calibrated export, retain the raw evidence and create the final graphs without inferring a datum or missing sample.

Final SGS Report

Reconcile programme, field report and gauge evidence

Build the final SGS technical report only after the station register and programme-versus-actual evidence are reviewed.

Controlled issue

Approval and distribution chain

Every gate recorded
01
AI-assisted programme QA + human close-out

Resolve or close every highlighted review item. The agent never auto-corrects facts.

FIRST GATE
02
Contractor approval

A named contractor approver signs the reviewed controlled issue.

LOCKED
03
Client approval request

WellOS emails a secure approval button. The client signs in and records the decision in the system.

LOCKED
04
Approved distribution

The final approved issue goes to the authorised distribution list or connected operating-company platform.

LOCKED
Client approval email and external-platform delivery remain locked until authenticated approval links, authorised recipients and the selected connector are configured. No email is sent from this panel automatically.
KPI TRACKINGREPORT DRIVEN

Performance from controlled job records

Track productive time, NPT, run success, report completion, HSE events and service delivery. Training records remain separated from client operations.

Active wells
0
Current validation estate
Historical reports
0
Searchable operational records
Open findings
0
Events awaiting review
Unrecovered fish
0
Current well-history records
Current operations
WellProgrammeCrewStatusProgress
Highest integrity risk
TODAY · DAILY JOB FEEDROLLING REPORTS

Live operational reports

Each active job has its own panel and rolling daily report. Timed field updates build the feed, and only authorised recipients receive controlled issues.

Active today0 jobsNext issue10:00 scheduled summary
Jobs running todayDAILY FEED
The panels are rebuilt from the active job feed each day. A job without recorded updates remains visible as awaiting field entries; WellOS does not create an activity to fill the gap.
Controlled distribution

Scheduled report delivery

CHECKING REPORTS SENDER
Sender: Protected WellOS report identity. Scheduled issues: 10:00 and 15:00 site time. Authorised recipients load from protected runtime settings. Automatic scheduled delivery remains off until a report-delivery schedule is connected.
50-WELL SYNTHETIC ESTATE

Well database

Search ten years of lifecycle records and inspect intervention exposure, barrier condition, fish status and schematic history.

Records0Fields5 fictional assets
Well estate50 shown
WellTypeReportsIntegrityFishStatus
PUBLIC-SOURCE RESEARCH LAYERPROVENANCE REQUIRED

Drilling, seismic and reservoir history

Build a deeper well story from open well-completion reports, survey catalogues, reservoir and facies datasets, hydrocarbon shows and physical-sample references. Every imported fact must retain its source, licence and review state.

Demo histories50 synthetic wellsCurrent statusSource-informed analogue
Data boundary: the wells and values shown below are fictional demonstration records. The source families and links are genuine public resources; no fictional result is represented as a real government or operator record. Seismic interpretation remains subject to qualified geoscience review.
Drilling and construction historySOURCE-INFORMED SYNTHETIC
Seismic and reservoir contextTRACEABLE
Official public sources

Research catalogue

Licence checked per record
50 LIVE WELLBORE MODELSREVISION CONTROLLED

Wellbore schematics

Each diagram is generated from the selected well record. Casing, completion equipment, flow-control devices, restrictions, perforations and fish status change with the selected configuration revision.

ReferenceMDRT synthetic datumApprovalEngineering review required
Demonstration boundary: these are fictional well configurations modelled on the information structure seen in the supplied programme schematic. They are not approved field schematics and must not be used operationally.
Wellbore schematicCURRENT
CasingTubing / completionVerified componentRestriction / fish
FIELD-REALISTIC ANOMALIESFULLY FICTIONAL

Intervention event history

Wire parting, fish-in-hole, failed tests, depth conflicts and recovery operations are deliberately present so the agents can be tested against difficult histories.

0Slickline wire-parting events
0Unrecovered fish records
0Successful fishing recoveries
Test condition intentionally included

Some wells contain unresolved fish and repeat wire failures. This is expected synthetic behaviour, not a platform fault.

AGENT TEST DATA
DateWellOperationEventDepthOutcomeAgent
SLICKLINE VOICE-TO-REPORTCONTROLLED FIRST RELEASE

Generate the slickline field report

Open a clean slickline report and start speaking. WellOS structures each confirmed activity, pressure test, toolstring and gauge record before anything is submitted to the well history.

Field-ready scopeSlickline onlyNew reportAlways starts blank
New daily report

Slickline Job Report

Slickline is the controlled release scope. Other service lines stay disabled until the slickline workflow is proven end to end.

VOICE SERVICES AGENT · SLICKLINEONGOING CONVERSATION

Talk throughout the wellsite day

Ask general slickline questions, record job facts and request cited well-history evidence. If the field history, approved programme or client procedure is unavailable, the agent says so and does not guess.

Release scopeSlickline firstDecision gateHuman approval required
Talk to the Well Services AgentTap the microphone or type a slickline question. The conversation is retained on this device until you clear it.
Wellsite conversation
CHECKING MODEL
Permanent traceability

Flow-control device and plug register

DateWellActionDeviceSerial / IDDepthPorts / configurationStatusReport
Evidence returned by agent

Recent operational history

SLICKLINE TOOLSTRING BUILDERSYNTHETIC ENGINEERING MODEL

Build the string before the run

Choose a fictional well, add or reorder the toolstring components, and inspect a 3D-style assembly in the wellbore. The visual library follows common toolstring families—rope socket, stems, swivel, knuckle, jars, shock absorber and pulling tools.

Selected well—Model stateDraft / unsaved
3D-style wellbore viewCHECKING
SurfaceRestrictionTarget depth
Production tubing
Surface ↑Tool sequence is shown top-to-bottomDownhole ↓
MULTI-AGENT ORCHESTRATION

Agent Center

WellOS coordinates four domain agents over the same controlled lifecycle record. Human approval remains visible for safety-critical recommendations.

HS
READY

HSE Agent

Testing against 184 synthetic HSE records, 31 near misses and 10 years of corrective actions.

Next buildControl matching
QC
READY

QA/QC Agent

Testing report evidence, sign-off, certification currency and conflicting depth entries.

Next buildAudit packs
EN
READY

Engineering Agent

Testing barrier state, wellbore configuration, restriction depths and schematic revision logic.

Next buildLive schematics
WS
READY

Well Services Agent

Testing programmes for slickline, perforating, workover, integrity, sidetrack and CT operations.

Next buildPre-job advice
Example orchestrated decision
KES-07 · Slickline programme review

Historical wire-failure risk identified

Well Services found two prior wire-parting events near a completion restriction. Engineering verified the current schematic depth, QA/QC detected an inconsistent recovered-length entry, and HSE added a dropped-object and stored-energy control review. Supervisor confirmation is required before programme release.

HUMAN APPROVAL REQUIRED4 AGENTS CONTRIBUTED
Governance state
Source traceabilityEvery finding points to a synthetic record
PASS
Human decision gateSafety-critical actions cannot auto-release
ACTIVE
Data classificationDemo data separated from client records
CONTROLLED
COMMERCIAL WORKSPACESYNTHETIC CONTRACT DATAAI T&C REVIEW

Invoicing & contract assurance

Convert approved operational evidence into contract-aligned billing. WellOS reviews each NPT event against the active terms, rate schedule and supporting job record, then holds invoice release until operator and contractor decisions agree.

Current periodAugust 2026 demoInvoice gateNPT review required
Billing ready
42
Approved synthetic work tickets
Draft invoice value
A$482k
Synthetic demonstration only
NPT awaiting alignment
3
Operator and contractor decision gate
Exceptions
6
Clause, rate or evidence review
AI contract review

Align NPT before invoicing

Evidence → clause → rate → dual approval
Synthetic NPT review workbenchREADY TO REVIEW
01 · CAPTURENPT eventCause, start/finish, assets, people and notification.
02 · VERIFYOperational evidenceDaily report, fault record, timesheet and client acknowledgement.
03 · REVIEWContract T&CsActive revision, clauses, definitions, exclusions and rate schedule.
04 · ALIGNTwo-party decisionOperator and contractor approve or record a dispute.
05 · RELEASEInvoice lineOnly the agreed treatment and evidence pack move forward.
Invoice preparation

Connected commercial flow

Report → utilisation → contract rule → invoice
Synthetic invoice workbenchDRAFT
PackageServiceJob daysT&C alignmentBilling stateEvidenceDraft value
P1 DedicatedDay / night linesSlickline9.5AlignedReady100%A$168,420
P2 Dedicated4.5 h equipment NPTSlickline8.0ReviewBlocked94%A$126,780
PE-01Pumping packagePumping6.5AlignedReady98%A$94,600
WH-02Wellhead serviceWellhead7.0AlignedReady97%A$92,840
Contract controlsACTIVE
Active contract revision

Each job is checked against the signed contract and rate schedule effective on the event date.

Clause-level traceability

Every recommended treatment points to the applicable definition, NPT clause, exclusion and rate rule.

NPT responsibility

Cause, responsible party, notice timing and evidence are reconciled before equipment or personnel time is rated.

Human decision gate

No disputed NPT line is released until operator and contractor approvals are both recorded.

Contract library

Rate and obligation controls

01 · RATE CARDS

Version-controlled pricing

Effective dates, package classes, personnel rates, equipment rates and approved discounts.

02 · BILLING RULES

Automated validation

Working, standby, NPT, mobilisation, recharges and client-specific charging conditions.

03 · EVIDENCE PACK

Invoice support

Approved reports, crew hours, equipment utilisation, network number, job dates and audit trail.

LIVE BUILD

What is being built next

This version keeps the website available while the original Manus-dependent services are replaced with Fourth Horizon AI-controlled infrastructure.

PHASE 01 · LIVE NOW

Operational shell and data estate

The working review surface you are viewing now.

  • 50 fictional wells
  • 10 years per well
  • Six intervention families
  • Wire parting and fishing events
PHASE 02 · IN BUILD

Persistent well database

Move synthetic data into a governed relational store.

  • Well master and configurations
  • Versioned schematics
  • Reports and attachments
  • Certification and maintenance
PHASE 03 · NEXT

Agent workflows

Connect controlled AI reasoning to each domain.

  • Voice-to-report
  • Pre-job advisory
  • Audit and assurance packs
  • Human approvals